Calgary Jeep Association
General Forums => Chit-Chat => Topic started by: 4PLAYZJ on November 30, 2009, 06:32:03 PM
-
Running a sub service to my new garage. Would like to know what size of conductors to run to the sub panel. The run is 50' long and will be a 100 amp sub service from a 200 amp panel.
-
I have speaker wire at the house Will if you need.
It was to easy :P
-
speaker wire
Exactly what I was going to suggest...
-
I would use a #2 AL URD which is a underground wire, and drop a ground plate in the ground with a #6 Strand cooper wire for the ground.
-
I would use a #2 AL URD which is a underground wire, and drop a ground plate in the ground with a #6 Strand cooper wire for the ground.
He could but in doing so he would violate code, its a sub service you can only ground the main service, a sub service must be "bonded" to the main service
I talked to him already so hes good to go
-
Thanks for the info Steve.