We have a bridge!
Thanks to a lot of effort from:
Ian
Dave
Tim
Blair
Tom
Martin
Scott
Abutments went in, the stringers were placed, decking nailed, and 4X6's anchored.
The drill cratered with four top wing holes to drill, so there are four grade retainer logs to attach and the abutments to be filled to make it driveable.
Dave will get a backhoe in to do the backfilling.
It was a perfect day for building, although the ground had a surprising amount of frost for the first hour or so. When we arrived at the trail head, the reserve decking planks we had left from last time, were gone, but it was apparent they had been removed very reciently. A hundred yards down the trail, Dave noticed them stacked up beside a camper. We simply stopped, moved the planks 20 feet to daves truck, cut them to 8 foot lengths with the chain saw and carried on. There was no response from the camper, so they were either off hunting, or too ashamed to poke their heads out of the camper. Tim left a note thanking them for helping us transport the decking!
As expected, it was a lot of hard work, but very rewarding! Thanks again guys!
Bob