After the show and shine, there will be a trail run at McLean Creek. This run will be lead by 37sandrunning, with a possible second group that may be lead by WhiteOut.
Requirements are:
-Front and rear recovery points
-Recovery gear (minimum of one good quality recovery strap, no metal hooks)
-Good MT/AT tread tires (minimum size 31" unless previously arranged with trail leader)
-Vehicle in sound mechanical condition
-Full size spare tire
-Basic hand tools
-Extra fluids
-Work gloves and appropriate footwear (work boots or hiking shoes/boots) for driver and winch wenches
-Spare footwear and clothing for everyone in the vehicle
-Ample food and water for everyone in the vehicle
This is likely to be a pretty large crowd of folks, so we may split into multiple groups based on numbers and variety of rig sizes. Trail choice will be based on conditions, rig size, and driver experience level.
Please understand that if your rig and experience level don't meet the requirements of the trail leader, you will not be joining us on this run. If this happens to be the case, simply ask around - there is almost always a shotgun seat available with an experienced wheeler, and you can still enjoy the trail run.