30.00 an hr. you buy all the parts. take's about a week, i do this in the evenings. last one i did was 450.00 for labor. sean spent about 600.00 for shocks, u-joints, spring perches,some brake line's.286-4412 / Arron
ckeck with BECKER on here his name is[ sean ]