Only a few days to the bridge project so here is some more info.
On Saturday we will split up into some groups with one group working on drilling 60+- holes we still need in the bridge beams and also assembling the bridge components. We will have a generator on site but more would be helpful. Also large sockets, wrenches and electric impact wrenches will be helpfull, pinbars and a come-along with chain would be helpfull aligning components.
A second group will be working on completing the abutments and adding some fill to raise the level of the bridge. For this rakes, shovels, drills hammers, chain saw and chain saw pants all will be tools we need.
At the end of the day Saturday we hope to have the bridge in place and the steel components all assembled.
On sunday we will move the wood for the bridge deck, and install it on the bridge. For this saws, hammers, drills, screw guns, , grinder with a cut off wheel, generator, chain saw and chain saw pants, all will be helpfull tools. If you have tools bring them please.
Please remember to bring and use personal proper safety equipment.
Below is a ling to maps on the ASRD web site.
http://www.srd.gov.ab.ca/fieldoffices/southernrockies/ghostwaiparous/pdf/Panel_B2.pdfThe bridge is located between points 93 and 89 on the map. We will be meeting at the Ghost Air strip at 8:45 and leaving for the bridge site by 9;15. If you are coming in on a quad you can unload and start the trail from the gravel pit.
If you want to camp for the weekend please send me a PM and I can provide you with that info.
Thanks for your help.